Home · Manufacturing

Production where it matters.

Our Gurugram footprint is designed for subsystem assembly, test, and integration aligned to OEM and IR/Metro requirements.

AREL manufacturing and assembly facility, Gurugram, National Capital Region
Gurugram facility · assembly, test, and integration
— 04 / Manufacturing

A facility built
for the next decade
of Indian rail.

Our 6,000 sq. metre facility in the National Capital Region is engineered for precision manufacturing, testing, validation, and assembly of safety-critical rolling stock systems. Located within 60 minutes of Delhi Airport, with pan-India project support capability built in.

6,000
Floor area
NCRIndia
Strategic location
Modularscalable
Production
ISO9001:2015
Quality system